Be the first to get your hands on CCDC’s new contracts with our spring seminars
Learn about:
- CCDC 2 – 2020 and Ready-for-Takeover
- CCDC 5A, 5B, and 17 – 2025, Construction Management (CM)
- CCDC 30 – 2025, Integrated Project Delivery (IPD)
This June, the Canadian Construction Documents Committee (CCDC) will release new versions of the key CCDC 5A, 5B and 17 construction management contracts and the CCDC 30 Integrated Project Delivery contract.
To help navigate these new documents, CCDC will be delivering 30+ seminars across Canada between April 28 and May 22. These seminars will also cover key provisions of CCDC 2 – 2020 that are now being introduced into the new contracts.
All registrants will receive advance copies of the new contracts, plus a brand-new guide to CCDC 30, ensuring you’re fully prepared prior to their official release. You’ll also receive the official copies once they are published in June – a total approximate value matching the registration fee.
Program
Each 4.5-hour seminar will cover the new construction management contracts (CCDC 5A, 5B, and 17), the updated integrated project delivery contract (CCDC 30), and the key changes in CCDC 2 – 2020 that have been incorporated into these new contracts.
Keep reading to learn more about what attendees will gain from the seminars.
Stipulated Price Contract (CCDC 2 – 2020) – Ready-for-Takeover
- Why Ready-for-Takeover was introduced as the key project milestone
- The difference between substantial performance and Ready-for-Takeover
- The prerequisites for achieving Ready-for-Takeover
- How Ready-for-Takeover impacts release of holdback, warranty, insurance, and other aspects of the project
- Other key considerations and best practice guidance
Construction Management
- Benefits, risks, and when the construction management delivery model is best used
- Differences between the CCDC 5A and 5B models of construction management, including the roles of the Owner and the Construction Manager
- Latest trends and challenges with construction management contracts
- The extent and limits of the Construction Manager’s responsibilities (e.g. design, safety)
- What’s been changed from the 2010 versions of the three contract forms
Construction Management Contract – for Services (CCDC 5A – 2025) and Stipulated Price Contract for Trade Contractors on Construction Management Projects (CCDC 17 – 2025)
- How the CCDC 2 – 2020 Ready-for-Takeover milestone has been implemented in the unique CCDC 5A/17 model
- The makeup of the Construction Manager’s compensation for their services
- How the roles of Owner and Consultant differ under the CCDC 5A model
- The numerous services performed by the Construction Manager
- Important differences between CCDC 17 and CCDC 2
Construction Management Contract – for Services and Construction (CCDC 5B – 2025)
- The Construction Manager’s obligations in their performance of the work and services
- Different cost elements within the Contract Price, including the Construction Manager’s fee and what costs are eligible for reimbursement
- The various options that are available to the Owner and the Construction Manager that are built into the CCDC 5B form
- The provisions specific to cost-plus contracts found in the CCDC 5B, including those on defective work, auditing, and subcontractors
Integrated Project Delivery Contract (CCDC 30 – 2025)
- How the IPD model works, including the fundamental principles and why so many see it as the future of construction
- Key considerations contemplated by CCDC during the updating of the CCDC 30 contract form
- The four phases (validation, design/procurement, construction, and warranty) within the CCDC 30 contract and the tasks and responsibilities of the parties under each
- Important concepts and mechanisms in CCDC 30, including target costs and added value incentive items
- Unique challenges of the IPD model and how to address them (e.g., cash flow, failure to validate, insurance)
- Other best practice guidance to help ensure a successful IPD project
Q&A
Our seminars, presented by CCDC document authors, give attendees a unique opportunity to have their questions answered by those who know the contracts inside and out.
Don’t miss out on this opportunity to stay ahead of the curve with these new CCDC documents.
We look forward to seeing you there!